How a project runs
From feasibility to handover, step by step.
Every building goes through the same eight stages, whatever its size. Tell the planner where yours is up to and it shows your next step, every one after it, and what Constructions161 does at each.
Project planner
Where's your project at?
Three quick questions, then every stage from where you are to handover, and what Constructions161 does at each one.
- Done
- Your next step
- Still to come
-
Stage 1 of 8
Feasibility
Before money goes into drawings, find out what the site allows and whether the numbers work: what can be built there, roughly what it costs, and which approvals it will need.
What Constructions161 does Project feasibility: an early, honest look at the site, the idea and the budget.
-
Stage 2 of 8
Design and consultants
Design and construct: In a design-and-construct contract the builder engages the architect, engineers and other consultants and runs the design, so one party answers for both the design and the build.
Build only: On a build-only job your own architect and consultants finish the drawings and documents, and the builder prices and builds from them.
What Constructions161 does Working with consultants in every discipline, and with you, through the spatial, accessibility, acoustic and fire-compliance questions every building raises, to the budget you set.
-
Stage 3 of 8
Council approval
Many projects need council to approve the use of the land (a development application, or DA) and any operational works, such as driveways, drainage and earthworks. Some need negotiating along the way.
What Constructions161 does DA and operational works applications, with help negotiating with council where it is needed.
-
Stage 4 of 8
Building approval
A building certifier checks the design against the building code and approves it before construction can start.
What Constructions161 does Building approvals: getting them in place so work can begin.
-
Stage 5 of 8
Budget and tender
The design is priced in detail. Trades and suppliers tender for their parts of the work, so the budget rests on real prices rather than guesses.
What Constructions161 does Construction budgeting and tendering.
-
Stage 6 of 8
Contract
Design and construct: One design-and-construct contract covers the design and the building.
Build only: A build-only contract covers building the design you already have.
Either way, this is where the scope and the price are agreed in writing.
What Constructions161 does Design and construction contracts, and build-only contracts.
-
Stage 7 of 8
Construction
The site is fenced and set up, and the building goes up: structure, then walls, windows and roof, then services and finishes, with the trades and deliveries co-ordinated throughout.
What Constructions161 does Hands-on project management, with the director closely involved from concept and design through to delivery.
-
Stage 8 of 8
Handover
The finished building is checked, completed and handed over, ready to use.
What Constructions161 does A finished project, on time and to budget: the standard the company holds itself to, and the reason so much of its work is repeat business.
Answer the questions and your next step shows here, with what happens from there to handover.
Already know what you need? Call 07 5391 1719.
What Constructions161 does here:
How a building goes up
One site, five stages, one builder running all of it.
Scroll through a building going up. The drawing stands in for photos of a Constructions161 project at each stage.
Set out
Approvals in place and the contract signed, the building's position is surveyed and pegged on the ground before anything is dug.
Site and slab
The site is fenced and set up, the crane goes up where the job needs one, and the footings and slab go down.
Structure
Floor by floor, the structure rises, with the trades and deliveries co-ordinated so each floor follows the last.
Closed in
Walls, windows and roof close the building in, and the services and finishes follow inside.
Handed over
Hoarding down, landscaping in, and the finished building handed over: the day the whole project is aimed at.
Questions people ask
Before you start.
Do I need a DA?
It depends on what you're building and where. Many projects need one; some don't. A feasibility check answers it early, before you spend on drawings.
What's the difference between a DA and a building approval?
Council's development approval is about the use of the land. Building approval, from a certifier, is about whether the design meets the building code. A project can need both.
Can I use my own architect?
Yes. With a build-only contract your architect's drawings are what Constructions161 prices and builds. With design and construct, the builder brings in the design team.
Where do you build?
Constructions161 is based in Parrearra on the Sunshine Coast, and delivers projects across South East Queensland.